[CATEGORY: OIL AND GAS]
GE Oil & Gas wins the contract to supply gas turbines for the third
liquefied natural gas facility in order to expand the Tangguh project, having
previously succeeded in providing original equipment for the first and second
facility. This third facility equipment orders carried out by local business
partner of GE in Indonesia, PT Imeco
Inter Sarana.
Tangguh facilities in West Papua province, Indonesia, is being expanded
to increase production of Liquefied Natural Gas (LNG) to more than 3.8 million
tonnes per annum (mtpa), so that the capacity of the facility can be reached
11.4 metric tons per year. Indonesia is one of the leading LNG supplier in Asia
and one that has the fastest growing economy in the world.
"The agreement that GE will provide third liquefied natural gas
facilities to Tangguh, nearly 15 years after the previous agreement realize the
first two facilities, is a reflection of the performance of non-stop from the
facility prepared by GE Oil & Gas," said President & CEO-Turbo
Machinery Solutions, GE Oil & Gas Rod Christie.
The components of the turbo compressors provided by GE Oil & Gas
will be manufactured at GE facilities in Greenville, South Carolina, USA and
Florence, Italy, where the facility will be built and tested.
All complete data can be seen at www.tender-indonesia.com
(The source of the Indonesia Oil and Gas,
Mining, Electricity, Infrastrcuture, Telecommunication tender project and
tender award)
wow fantasic GE WINS CONTRACT IN TANGGUH PROJECT
BalasHapuso iy ka "Zapplerepair pengerjaan di tempat. Zapplerepair memberikan jasa service onsite home servis pengerjaan di tempat khusus untuk kota Jakarta, Bandung dan Surabaya dengan menaikan level servis ditambah free konsultasi untuk solusi di bidang data security, Networking dan performa yang cocok untuk kebutuhan anda dan sengat terjangkau di kantong" anda (http://onsite.znotebookrepair.com)