Selasa, 01 November 2016

KS READY OPERATE 3 STEEL MILLS UPSTREAM






[CATEGORY : MANUFACTURE]
 
PT Krakatau Steel Tbk (KS) is ready to operate again three steel mills upstream, if the price of gas down to the level of US$ 3 per million metric british thermal unit (mmbtu). Three plant there are sponge iron plant, slab plant, and semi- billet plant.


All complete data can be seen at www.tender-indonesia.com
(The source of the Indonesia Oil and Gas, Mining, Electricity, Infrastrcuture, Telecommunication tender project and tender award)

Tidak ada komentar:

Posting Komentar