Selasa, 22 November 2016

CONSTRUCTION OF GERAK SEMBAYAT DAM, GRESIK DISTRICT


[CATEGORY: INFRASTRUCTURE]

Gerak Sembayat dam was built to meet the needs of raw water in Gresik and Lamongan, East Java Province.  Gerak Sembayat dam located in the Sidomukti village, Bungah District, Gresik, as well as Karangbinangun village and Gawerejo village, Karangbinangun District, Lamongan, East Java. Gerak Sembayat dam construction is divided into two (2) construction contracts and one (1) contract supervision, namely: Package SB-1 for Civil construction was carried out by a joint operation between PT Brantas Abipraya (Persero), PT. Waskita Karya (Persero) and PT Wijaya Karya (Persero) (called BAP-Waskita-WIKA, KSO), and Package SB-2 to Hidromekanikal work conducted by PT Barata Indonesia (Persero) Unit Usaha Mandiri Tegal,  and Construction Supervision Package conducted by PT Yodya Karya (Persero) Branch of Semarang. The total value of the three packages of Rp720,9 billion.


All complete data can be seen at www.tender-indonesia.com
(The source of the Indonesia Oil and Gas, Mining, Electricity, Infrastrcuture, Telecommunication tender project and tender award)

1 komentar:

  1. CONSTRUCTION OF GERAK SEMBAYAT DAM, GRESIK DISTRICT very cool !!
    ka aku mau recommend nih tentang "Zapplerepair pengerjaan di tempat. Zapplerepair memberikan jasa service onsite home servis pengerjaan di tempat khusus untuk kota Jakarta, Bandung dan Surabaya dengan menaikan level servis ditambah free konsultasi untuk solusi di bidang data security, Networking dan performa yang cocok untuk kebutuhan anda dan sengat terjangkau di kantong" anda (http://onsite.znotebookrepair.com)

    BalasHapus