Senin, 24 Oktober 2016

8 INCOMING PROJECTS IN BATAM




[CATEGORY : INFRASTRUCTURE]
      
GENERAL CARGO PORT OF SEKUPANG
1.  To develop the existing Sekupang General Cargo Port
2.  The goal is to build 691 m of wharf, in order to hadle 200.000 ton of general cargo per year.
3.  Location : On the international shipping route.


GENERAL CARGO AND LIQUID BULK PORT OF KABIL
1.  To develop the existing Kabil Port, in serving the import and export activities from Batam and Indonesia in general
2.  The unlimate design for capacity of more than 10 – 15 million TEU’s.
3.  Location : Close to Tanjung Sauh Island, about 20 km to the South East of Singapore.


BATAM TOLL ROAD
1.  To smooth the traffic flow off goods and people from/to ports and industrial park in Muka Kuning.
2.  To provide alternative roads from/to ports and in Muara Kuning Industrial Parks
3.  Route : Batu Ampar – Kaabil Cross Section, Kabil Cross Section – Airport, Kabil Cross Section – Muka Kuning, Punggur Cross Section – Airport, Airport – Muka Kuning


BATAM MONORAIL
1.  To provide a save, fast and convenience public mass transportation in Batam that will be connecting Batam Centre to Tanjung Uncang via Muka Kuning (phase-1). For the next phase, monorail line would be liked to Batu Amper and Nongsa.
2.  The goal is to have a monorail line along 27.4 km from Batam Centre to Tanjung Uncang for first phase and for the second phase will be 28.6 km from Batu Ampar to Hang Nadim International Airport


CARGO TERMINAL OF HANG NADIM AIRPORT
1.  To develop the existing Cargo Terminal of Hang Nadim Airport
2.  The goal is to have an extensive warehouse area of 9.800 m2
3.  Location : Hang Nadim Airport is located in Nongsa district on the Eastern of Batam Island


REVITALIZATION OF PASSENGER TERMINAL 1 AND DEVELOPMENT OF PESSENGER TERMINAL 2 IN HANG NADIM AIRPORT
1.  To revitalize the existing pessenger terminal terminal 1 and develop the pessenger terminal 2 of Hang Nadim International Airport.
2.  The goal is to have a capacity of 6.5 million pessenger in Terminal 1 and 8 million pessenger in Terminal 2. In 2033 we plan to reach an ultimate capacity of 32 million pessenger and 1.6 million ton of general cargo.


BATAM – BINTAN BRIDGE
Reside between Local District of Nongsa in Batam Island and Tanjung Sauh Island, between Tanjung Sauh Island and Buau Island, and between Buau Island and Local District of North Bintan in Bintan Island.


TANJUNG SAUH CONTAINER PORT
Tanjung Sauh Island, Located 1,8 km to the South East of Batam Island and 10 km to the West of Bintan Island, has a very strategic position on the international ship route.

Port   
2200m
Depth
18 m
Backup Area Capacity
4.000.000 TEUs







All complete data can be seen at www.tender-indonesia.com
(The source of the Indonesia Oil and Gas, Mining, Electricity, Infrastrcuture, Telecommunication tender project and tender award)


Tidak ada komentar:

Posting Komentar