[CATEGORY : INFRASTRUCTURE]
Great Hall of the Implementing of National
Road VIII Surabaya decided the construction of a shortcut Mengwi-Singaraja
which reduced from planned four units to two units. At present, the
construction plan of the shortcut is already finalizing the detailed
engineering design (DED) and have not been able to determine the cost of which
will be spent before the DED phase
finish. The roads in Bali should be prioritized obtain the best possible repair
periodically because Bali is one of an international tourism destination.
All complete data can be seen at www.tender-indonesia.com
(The source of the Indonesia Oil and Gas,
Mining, Electricity, Infrastrcuture, Telecommunication tender project and
tender award)
CONSTRUCTION OF SHORTCUT ROAD MENGWI-SINGARAJA BE RE-EXAMINED thaks for info dan ka ini aku mau reccomend tentang HOSTEL MURAH DI BANDUNG COCOK UNTUK BACKPACKER aku reccomed banget nih buat yang bingung cari penginapan di daerah bandung
BalasHapus